Building News is an information portal for all professional building specifiers. Here you can find all of the latest construction news from around the UK and the rest of the world.

The Construction Leadership Council was created with a remit to drive improvement within the construction sector. Since its creation, it has worked to encourage collaboration to build a better industry, and to act as a bridge between the public and private sectors in pursuit of this objective. The challenge of responding to the Covid19 pandemic has emphasised the importance of this, and the necessity of creating a more robust and sustainable industry which can build back better as the UK enters the period of recovery. This is why the CLC, through its own members and also through its wider links with the industry, has collaborated and supported the combined efforts of the Cabinet Office and Infrastructure & Projects Authority, with input from across the public sector, to develop and publish the Construction Playbook, and to endorse its aim of creating a more strategic relationship between Government and the construction sector.

Government Departments, other public bodies and the wider public sector represent key construction clients, investing in nationally significant infrastructure projects, capital programmes such as those in education and healthcare, projects that improve our cities and towns, and supporting the delivery of new homes. This spectrum of activity across the sector means the public sector has the potential to drive industry transformation, and how it approaches the development and delivery of construction can provide a powerful impetus for changes in industry practice and culture that extends beyond the projects it funds directly.

That is why the publication of the Construction Playbook is significant. It aims to embed a new approach to the procurement and delivery of construction projects and programmes, which is more collaborative, engages the whole supply chain, encourages investment in innovation and skills, and supports a more sustainable, resilient and profitable industry, capable of delivering higher-quality, safer and better performing built assets for its clients. It will create the foundation for a new approach to construction, where we can utilise digital and offsite manufacturing technologies to increase the capability of the industry, and accelerate the delivery of built assets.

It will also aim to deliver a better and fairer industry, with stronger and more open relationships between the industry and its clients, fewer disputes, and more equitable contractual terms, that ensure prompt and fair payment and a balanced allocation of risk, where these are managed by the organisation best placed to do so. Finally, it will help ensure that investment in construction projects creates the greatest economic, social and environmental value possible, and contributes to the delivery of strategic policy objectives such as our legal obligation to achieve net zero carbon by 2050 and levelling up across the UK.

These goals are our goals at the CLC. We share the Government’s desire to improve performance through new ways of working. But publishing the Playbook is just the first step in the process. For real change to happen, it is important that both Government and the industry embed the principles of the new approach, and invest in their capability to deliver this. The Government will be working to implement this across all central government Departments and public bodies, and mandating the adoption of this approach whilst recognising there is no-one-size-fits all approach to delivery. The CLC will work with organisations across the industry to ensure that this effort is matched, and that the public and private sectors can support each other in this shared endeavour.

Andy Mitchell, Co-Chair of the Construction Leadership Council

 

The Construction Playbook captures commercial best practices and specific sector reforms outlining the government’s expectations of how contracting authorities and suppliers, including the supply chain, should engage with each other.

These are set out in 14 key policies for how the government should assess, procure and deliver public works projects and programmes which all central government departments and their arms length bodies are expected to follow on a ‘comply or explain’ basis.

Download the CONSTRUCTION PLAYBOOK here

 

A cladding fire detection system that could offer a lifeline to thousands affected by the UK’s cladding crisis is undergoing a critical period of testing with one of the UK’s leading testing bodies, the Fire Protection Association.

Intelliclad, created by Darron Brough and Mohammed Zulfiquar, believe that their sensor, which would be retrofitted to integrate into the cladding system of high-risk buildings, can provide a smarter, faster and more cost efficient method of monitoring fire safety when compared to the controversial Waking Watch.

Darron and son Ryan Brough bring decades of experience in the façade industry with a focus on safe aluminium cladding to the project, while Mohammed Zulfiquar, owner and founder of Datatecnics Corporation, has 30 years experience in computer science and nanotechnology.

Each sensor is connected to a control system that, in the event of a fire, can uniquely send an alert to all residents via a smartphone app.

This gives residents and the fire service valuable information on the location and relative spread of fire across the building throughout the incident in real time.

The system is currently undergoing final testing at the Fire Protection Association’s headquarters in Moreton-in-Marsh after three years and around £500,000 of research and development investment.

Intelliclad Managing Director, Darron Brough, said: “We started this intelliclad journey because we wanted to put our expertise to good use to try and help those who are suffering with mental health issues, crippling bills and concerns for their safety as a result of living in an unsafe building.

“Our system offers a smarter and faster alternative to the Waking Watch – we want to give residents a greater peace of mind and greatly reduce the cost of safety which they should be entitled to.

“From our perspective, testing with the Fire Protection Association has been a huge success and we await confirmation of these results over the coming weeks as data is analysed, which we believe will allow us to move forward and start to really help people.”

There is much controversy surrounding Waking Watch, which has recently been labelled a ‘national scandal’ by Secretary of State for Housing, Communities and Local Government Robert Jenrick, who criticised the cost for the service, averaging up to £499 per dwelling per month often passed on directly to residents, as a ‘rip-off’.

A number of stories have also appeared in recent months highlighting a lack of fire safety training for Waking Watch staff, as well as instances where they have fallen asleep or been caught watching tv, putting residents lives at risk.

Mr Brough said: “We have put our heart and soul into this project for the last three years and we are well aware of just how important an issue this is right now.

“From the impact on residents’ mental health, to the very real threat of loss of life as a result of dangerous cladding, we want to do our part to end this scandal and help those affected move forward.”

 

For more information, contact info@intelliclad.co.uk

 

Follow us on Twitter            Join us on Linked in  

 

New whitepaper explores how to improve fire performance in the fifth façade

With roofs maintaining their prominent role in contemporary building design, ROCKWOOL has released a new whitepaper exploring how roofing contractors and specifiers can manage fire risk when planning and installing flat roofs.

The ‘Flat Roofs: Managing fire risk in the fifth façade’ report addresses misconceptions around testing protocols and material fire classification ratings, plus examines the worrying rise in roof fires and the resulting social and economic impact. The whitepaper, which is available to download at www.rockwool.co.uk/fifthfacade then outlines specification best practice for flat roof insulation and how to futureproof the complete building envelope in line with expected changes to Building Regulations.

 

“The role of the roof is an expanding one,” explains Paul Barrett, Head of Product Management at ROCKWOOL. “While previously their primary function was practical, now we’re seeing roof spaces used as an additional communal or leisure space, as well as to house solar PV, plant equipment and rainwater management systems. Yet as the function of the roof has expanded, the focus on fire protection measures hasn’t increased at the same pace.

“This report explores the risks of exposed flat roofs, delves into the effects of recent prominent fires, and then advises roofing contractors and specifiers on how to select materials that will help protect lives and the remaining building structure in case of fire. It’s an essential read for anyone involved in roofing specification.”

To complement its new whitepaper, ROCKWOOL has also developed an accompanying CPD module that expands subjects detailed in the report and delivers a greater depth of education. The module also outlines its range of non-combustible stone wool insulation products that are compatible with a variety of modern flat roof systems.

Follow us on Twitter            Join us on Linked in  

 

It has been a story almost three years in the making, from 2017, with the initial sale by Armstrong World Industries, through to completion of its acquisition by Aurelius Equity Opportunities earlier this year. Now Armstrong Ceiling Solutions, the leading UK manufacturer of mineral fibre ceiling systems, has unveiled its new identity which will take it into 2021 and far beyond. Graham Taylor, director of sales and marketing at the newly renamed Zentia, reintroduces the business behind the brand.

Moving to a new brand identity has been something of a personal journey for me. The Armstrong brand has been a constant through my working life. I have lived and breathed it for more than three decades. Which is why I was truly honoured and excited to be presented with the opportunity to lead the rebranding project for our new business.

We found ourselves in a unique position: with a strong and established past – and a future that’s ours to reimagine. To make the most of this, we needed a brand that builds on our heritage, but also gives us a fresh start, opening up new opportunities for us to explore together with our partners, staff and customers alike.

But the reality of it is, we are still the same people you’ve always done business with; we bring you the same products you’ve always trusted and specified; we will still manufacture in Britain, as we have since 1966; and we will provide the same support you depend on, and that you can continue to rely on with Zentia – a very positive base on which to build.

 

 

Our vision is to take those positive traits you have clearly valued and add more agility and boldness to our approach. We will take bold decisions and act swiftly where required. We will respond to the changing environment and market, whilst fully embracing the digital world.

We were Armstrong; now we are Zentia. We’ve gone from A to Z, introduced a bright and dynamic colour palette and centred our business around our new brand AXIS – four key elements which underpin our new direction. In the process, we’ve created a new brand that marks a pivotal evolution for our business.

Our AXIS is what drives us. It differentiates us and makes us strong. The four components of the Zentia AXIS are Value, Solutions Provider, Responsibility and Continuous Improvement, and they’re the four things that we promise to live, breathe and promote in everything we do and for every customer.

Value

We see that Value is about more than just price. We are driven to create environments that set higher standards for wellbeing, productivity and happiness. At the heart of this is our commitment to deliver quality products and solutions that will inevitably drive excellence through our supply chain and to exceed the expectations of all those involved, as well as the end user.

Solutions Provider

Being a Solutions Provider is about more than having a broad range of products and systems. Range is important, but so is agility and expertise; the ability to not only provide a product but provide a solution. As a complete ceiling solutions provider, this is what every partner can expect from us. We apply our heritage, pride and passion to deliver unrivalled problem-solving support.

Responsibility

We take responsibility for our actions and we aim to do more with less. We look at everything we do with an ethical mindset and scrutinise our activity so that we can continually improve our social, economic and environmental values for ourselves, our partners and our stakeholders.

Continuous Improvement

We focus on relentless progress and performance enhancement across our business, our solutions and the environments we help create. One key aspect that helps us do this is our digital-first mindset. As we pioneer digital services and supply chain support, we want to continually improve and make it easier than ever to do business with us.

This is such an exciting time for us as a company – creating a new identity for the business, a new ethos and new mindset. It’s not something that you experience a lot in your professional life, you might even say it’s a once in a lifetime change. It brings more strength, more power and more enthusiasm to our team, and I expect also to the market.

As Zentia, we draw from decades of leadership in the ceiling space, where we’ve become a trusted partner to specifiers, contractors, architects and interior designers who appreciate the exceptional quality of our products and the expertise of our people.

Now, we’re taking what we do well and harnessing technology to ease and add value to what you do. With digital collaboration, specification and support, we’re leading the way into a smarter future – that starts today.

To find out more about Zentia visit: www.zentia.com or follow #AtoZentia on social media.

Follow us on Twitter            Join us on Linked in  

Cogent Technology has moved into a new 80,000ft² facility in Felixstowe, to serve its clients with world class manufacturing. The new facility features state of the art production lines, including two ISO 14644-1 Class 7 Rapidbloc cleanrooms for its innovative medical and healthcare products.

Rapidbloc Cleanrooms have been developed by Connect 2 Cleanrooms (C2C) to meet the urgent critical demands of some of the world’s fastest moving industries, such as healthcare and advanced manufacturing. Clean production will enable Cogent to grow its product offering and expand services to clients with consumables and accessories that complement existing PCB assembly product ranges.

The two Rapidbloc cleanrooms were designed and built in just 8 weeks, including validation to ISO 14644-1 class 7. This expedited time-scale was important to Cogent as the cleanrooms were able to be coordinated within its wider facility fit-out programme and so production was not interrupted.

A monobloc cleanroom project of this scale would usually have a lead time of up to 4 months, whereas Rapidbloc Cleanrooms generate significant productivity gains to enable a faster return on investment. Rapidbloc cleanroom layouts are fully configurable and as parts are shipped from stock from C2C’s warehouse and distribution hub, on-site assembly is fast and efficient.

Robert Stainer, Commercial Director at Cogent says, “As part of our relocation to a new 80,000ft² facility we are proud to be enhancing our Medical Device manufacturing capabilities with the commissioning of two class 7 cleanrooms validated to ISO 14644-1.

“This investment will not only enable Cogent to meet our current clients’ needs, but also position the team to facilitate the provision of associated device consumables capacity as med tech businesses rethink their supply chain strategies in light of changing attitudes to sourcing.

“The term ‘short supply chain’ is resonating throughout the business world after recent events in 2020. A more robust supply chain is needed for resilience against future events.”

Michael Wright, Managing Director at Connect 2 Cleanrooms says, “Whilst there are now a number of quick build cleanroom solutions on the market, including our own Rapid Room range, none offer the same level flexibility around configuration and specification as Rapidbloc. The choice of size, classification and optional extras is yours, in just 4 to 6 weeks.”

The ultra-clean environments are created using HEPA filtration that is 99.99% efficient at 0.3 micron, whilst the envelope uses UltraTech Versatile panels with QuadCore insulated cores to provide a level of airtightness that controls running costs through enhanced energy performance.

Michael continues, “This modular approach delivers a precision-engineered cleanroom with ISO-compliant performance, within an expedited time frame. Thanks to the use of standard parts and pre-determined design calculations, even the quotation and design stages are expedited, so clients benefit from a rapid response through the entire project.”

Connect 2 Cleanrooms also provided consumables, furniture, monitoring equipment and cleanroom training services.

To find out more about Rapidbloc Cleanrooms, visit www.connect2cleanrooms.com/rapidbloc.

 

Follow us on Twitter            Join us on Linked in  

Brett Landscaping has supplied its GeoCeramica porcelain paving for the roof terraces and public spaces of a major new mixed-use development in London, overlooking the Grand Union Canal.

More than 1400 m2 of GeoCeramica has been installed across the communal areas of the £151 million Greenford Quay development, with 150 m2 used to provide a highly aesthetic finish to the communal roof terrace on the tallest tower in the scheme.

Greenford Quay is one of the UK’s largest ‘Build to Rent’ schemes with 1,965 new homes being built across seven main buildings within wide public realm spaces. The aim of the development is to create a vibrant mixed-use neighbourhood at the side of the historic Grand Union canal.

 

 

Project architect HTA Design required a high-quality paving system that would complement the curated gardens across the podium courtyards and upper terraces of the development, and a system that could meet the strict specification requirements for use on tall buildings.

The architect worked with the technical team at Brett Landscaping and chose to use the GeoCeramica range of porcelain paving. The range provides the look and finish of natural stone, while containing modern paving technology suited to the demands of the project.

Brett Landscaping were able to demonstrate that not only would the Fiordi GeoCeramica system provide a finish that met the aesthetic requirements of the upper terraces of the project, but that it could meet the loading requirements and ensure its suitability for the building’s design.

GeoCeramica is a hybrid porcelain and concrete paving flag tile with a pre-bonded cementitious water permeable drainage layer.

For the roof-top areas GeoCeramica has been installed on a pedestal system. This is made possible due to the inherent dead weight of each hybrid flag tile and its individual strength characteristics. The product could meet the technical brief without compromising on the aesthetics offered.

The specification of GeoCeramica provided HTA Design with assurance that the paving would prove durable in all weathers and conditions, at the top of the 14 storey Tillerman’s Court (Block 5) on the scheme.

A further 1200m2 of the GeoCeramica Impasto and Fiordi paving was supplied to provide footpaths and private terraces on the podium landscapes. These provide a high-end finish to the communal amenity gardens at first floor level.

Ajay Vohra, Specification Sales Manager – London and South East, Brett Landscaping said:

“The Greenford Quay project allowed the opportunity for Brett’s GeoCeramica to meet the needs of HTA’s brief and vision for the development for its roof and podium terraces. The elegant range of aesthetics available of this high-quality product, is the future choice and the latest progression in paving and roofing materials.

“At Brett Landscaping we offer high specification paving systems that add value to large public spaces and boost those complex intricate detailed areas. The Brett team provides the expertise, and offer the complete service from conceptual or technical design, right through to sale, supply and installation.”

Ian Hainsworth Senior Landscape Architect at HTA Design:

“Working with Brett allowed us to choose a paving system that met the high aesthetic requirements of this landmark luxury development, without compromising on the structural durability, reliability and quality of the installed system.”

“As former industrial estates are reclaimed and converted to modern living developments, there is a need for architects to design public realms that can offer residents a real sense of wide-open space. Greenford Quay is a landmark example of how new community neighbourhoods can be created through careful use of design and high-quality building materials.”

www.brettpaving.co.uk

Working on a brief to deliver a first-class facility for the pupils and teachers, Thorn Lighting has supplied both internal and external illumination for the £10 million education block that has revolutionised facilities at a Samuel Ward Academy in Suffolk. The luminaires were chosen to enhance the overall appearance of the state-of-the-art facility and create flexible and adaptable 21st Century learning environment for pupils, whilst providing a low maintenance, energy efficient solution.

The three-storey building replaced the school’s single-storey blocks A and B, which sat at the front of the building and, in addition to classrooms, the block houses the library, the SEN (special educational needs) resource base, specialist music and art rooms and media suites. Funding for the work came from the Government’s Priority School Build Programme with the building providing high standards in terms of natural daylighting, acoustic performance and the internal environment.

 

Thorn’s Arena LED luminaires illuminate the classrooms throughout the building. Their excellent light quality and sound absorbing features minimise the sound reverberation in the classrooms. Modern concrete walls, hard flooring and large amounts of glass all reflect (rather than absorb) sound. The echo effect created in this way can make it difficult to hear the teacher speak, causing students to raise the noise level even further by chatting amongst themselves. The innovative Arena LED minimises this.

Arena is a direct/indirect luminaire that gives the Academy a modern visual appearance. The fitting is available with a wide range of control options and has been designed for flexibility, offering a choice of infills to adapt the length of the system to match all classroom layouts, Arena is fully compliant with BB93 for optimum classroom performance, utilising high-efficiency LEDs to slash energy consumption.

Thorn’s Piazza robust IP65, wall mounted luminaires have been used for the illumination of the exterior of the building. Piazza has unique photometrics with 3 metre forward light throw and 12 metre spacing that also provides a very low upward light throw with less than 2.5% ULOR. Piazza delivers excellent 116 lm/W efficiency with simple installation.

For more information on Thorn and its products, see the website www.thornlighting.co.uk

Follow us on Twitter            Join us on Linked in  

ARISTON’S AURES SLIM MULTI PROVIDES ELECTRIC HOT WATER IN AN INSTANT

The Aures Slim Multi instantaneous electric water heater from Ariston is the ideal alternative to electric storage water heaters, as it requires no time at all to heat up. Water does not need to be stored – instead, it is warmed up immediately when it comes into contact with a powerful heating element as it flows through the unit, resulting in unlimited availability on demand. As a result, the Aures Slim Multi can be installed throughout a home or property close to point of use.

 Capable of producing hot water to serve multiple taps and showers (one outlet at a time – not simultaneously), the Aures Slim Multi is a wall-mounted unit perfectly suited to applications such as kitchens and bathrooms. It also has an ‘A’ class ErP energy rating, making it the most efficient method of providing water at the point of use. There is no energy loss as a result of water being heated instantaneously, while there is no need to maintain a pre-set temperature when not in use. Units are also easy to install and maintain, requiring only a connection to the water supply and a fused spur.

A front facing 4-step dial and LED indication ensures ease of operation, while allowing the power to be set to the desired level for optimal comfort. The LED indicators highlight the selected power level: ‘low’ (4.5kW), ‘medium’ (5kW) or ‘high’ (9.5kW). The Aures Slim Multi is also equipped with a flow sensor system, which initiates instantaneous water heating when an outlet is opened.

 

 

Other advantages include the plentiful, continuous delivery of hot water not being limited by the capacity of a tank, while small dimensions save valuable wall space – as well as eliminate the need for a storage cylinder. This makes the Aures Slim Multi the perfect water heating option for installation in small, narrow spaces, such as under a kitchen sink. As a result, the unit is suitable for applications including utility rooms, garages and conservatories.

Commenting on the instantaneous electric water heater, Victoria Gutierrez, Marketing Manager at Ariston, said: “Our Aures Slim Multi is proving extremely popular in projects where there is no mains gas supply or hot water storage facility present. Their high-quality construction, aesthetic appeal and level of performance, coupled with their space and energy saving credentials, ensure they are a fantastic means of supplying outlets with instant hot water.”

All internal components can be accessed from the front of the unit for easy maintenance, while a double thermal cut-out ensures safety and added peace of mind. Every Aures Slim Multi electric instantaneous water heater is also supplied with a two-year warranty as standard.

 

Further information about Aures Slim Multi can be viewed here.

 

For more details about Ariston and its range of electric water heaters, visit: www.ariston.com/uk.

 

Follow us on Twitter    Join us on Linked in  

Roofspace Solutions’ innovative off-site manufacturing (OSM) product i-HouseTM – which guarantees a waterproof dwelling in five days – is being implemented in a Lovell Homes site in Norwich. The result is a 35% timesaving compared to traditional building methods.

 Leading partnerships housing expert, Lovell Homes, prides itself on transforming communities across the UK. As part of its commitment to innovative residential construction and regeneration projects, it chose to embrace i-HouseTM OSM technology by Roofspace Solutions during the building of its latest development.

Crown Meadows in Norwich comprises two, three- and four-bedroom homes. Construction began in June 2020 and is planned to complete in two years – or possibly sooner as Roofspace Solutions’ i-House can create a watertight standard house shell in under a week, while combining quality, speed and safety.

In addition to speed, Lovell Homes specified i-House in 15 of the 69 Crown Meadows plots as part of its aim to reduce waste and dust, while also minimising the risk of accidents.

 

 A new way of working

The i-House uses a bigger and lighter variant of the aircrete block, which are lifted by crane and assembled in a similar sequence to a timber frame build. This results in a much faster construction process than a traditional build.

Intended for domestic property construction of up to three storeys, i-House consists of inner leaves of external cavity walls, separating walls, floors, lintels, cavity closures, insulation and roof trusses, with the inclusion of soffit and fascia for the internal skin of the property.

Roofspace Solutions is working alongside supplier H+H to design and produce the large-scale Celcon Elements, which are manufactured from the same material as the aircrete blocks. This gives them the same advantages, such as outstanding thermal performance and reduced heat loss at thermal bridges.

Manufactured with a width of 600mm and a thickness of 100mm, Elements are designed to be craned into place onto a bed of mortar on standard foundations. Blocks are joined using thin-joint mortar with 2mm (3mm) joints, providing an extremely airtight finish.

The fact that the solution is manufactured off-site, and larger elements are constructed prior to being delivered to the site in Norwich, means less waste and dust is created for workers. This results in a safer and cleaner working environment. Furthermore, workers on site are not exposed to chemicals.

Crucially, as the homes are watertight in under a week, it has increased Lovell Homes’ construction programme, allowing internal trades to begin their work sooner than with a traditional build.

With the additional consideration of building during the time of Covid-19, the OSM solutions enhance Lovell Homes’ stringent social distancing protocols. At the Crown Meadows site, approximately four builders will be able to build six houses in four weeks, with i-House increasing the output per person.

The i-House package also includes floor cassettes and JJI-Joists provided by Pasquill, sister company of Roofspace Solutions, due consistency of quality and supply and a nationwide delivery service. A total of 60 cassettes will be provided to the same 15 OSM plots on the Crown Meadows development, with each home’s first floor containing an average of 3-4 cassettes.

The Pasquill cassettes, which are made with chipboard and softwood, are ideal components to work alongside the i-House as they facilitate faster timescales and dramatically speed up the erection process. This increasingly popular method allows the contractors to install the floors in one day with little on-site work required.

The cassettes are also installed with Pasquill’s JJI-Joists, also known as I-beams, to create ‘quiet’ floor solutions and consistent dimensions provide extra stability. They do not need insulation to gain compliance with Building Regulation Part E (sound) when installed at 400mm centres and above. They are lightweight, stable, easy to run services through and cost effective.

 

 

Building better results

Paul Terry, Managing Director of Roofspace Solutions, said: “The construction industry is facing many challenges. The only way we will be able to ‘build back better’ and meet government and industry targets for housebuilding is by working together and embracing new technologies.

“The Crown Meadows development is coming along well, and we’re glad that Lovell Homes is already experiencing the time-saving benefits from i-House and Celcon Elements. We’re enjoying working on this project with a developer who has such high standards and look forward to seeing the site completed.”

Chris Gray, Senior Construction Site Manager at Lovell Homes, said: “I believe Crown Meadows will be a much quicker build, from start to finish. Of course, it’s difficult to compare like-for-like, but recently a plot went from being a concrete pad to us laying the roof tiles within two weeks – everything fits like a Lego set!

“Based on the success so far, it’s now our ambition to bring in the development a few months ahead of schedule. For the construction industry, it’s another tool to help us get the job done well and meet the demand for housing – while reducing waste and accidents on site.

“The fact it allows us to make a property watertight so quickly has immediate benefits, such as completing the show home quicker, allowing us to drum up local homebuyer interest sooner. Overall, I think this is a flexible solution that would have really useful applications during the winter or further north, where it typically rains more.”

Roofspace Solutions has been part of the Saint-Gobain Group since 2018, as part of its Off-Site Solutions division.

For more information on i-House, click here

 

 

Thorn Lighting’s new recessed ceiling luminaire, IQ Beam combines integrated features and a clean exterior to create a classic look incorporating the latest in lighting innovations.

IQ Beam is available in two microprism optics and three different lumen packages (up to 4300 lm). Offering up to 140 lm/W of efficacy and a UGR below 19, the MPT version is the perfect performance luminaire for task lighting applications such as office and educational environments. The MPT-F version features an additional micro diffuser foil for enhanced comfort with an efficacy of up to 134 lm/W – ideal for corridor applications.

IQ Beam can be a direct replacement for standard 600 mm x 600 mm soft ceiling luminaires, it enables both pull-up and lay-in mounting for tremendous flexibility and is suitable for installation into exposed T, plasterboard and concealed grid ceiling systems.  IQ Beam is available with a 3000K or 4000K colour temperature, CRI>80 and a lifetime of 50 000 hours @ L90 Ta 25°C. It can also be ordered with a daylight/motion detection sensor, emergency lighting and DALI dimmable control gear as well as various pre-wiring options.

Perfectly balanced, IQ Beam delivers distinct illumination to provide a brilliant enhancement to any space. For more information on Thorn and its products,.

 

 www.thornlighting.co.uk