Posts

 

Welcome Break opened its 60th service station at Junction 33 on the M1 in January, featuring a Stannah escalator, passenger lift and goods lift.

Spanning 32,000 square feet, located between Sheffield and Rotherham, the services offer state-of-the-art facilities, including dining options from KFC, Burger King and Starbucks as well as 28 EV charging stations and dedicated HGV amenities.

Designed to resemble a traditional Yorkshire village, the two-storey service station also includes retail, gaming, restrooms, seating, a children’s play area and remote workspaces. It marks Welcome Break’s first new motorway service in two decades.

 

Work

 Stannah Lifts collaborated with principal contractors, HML Construction, architects Whittam Cox and SVM Associates on this £55 million project to create a cohesive lift solution and modern design that delivers an inclusive and convenient experience for visitors.

Back of house, Stannah installed a Goodsmaster lift to facilitate the safe and efficient transportation of goods between floors while improving workflow and minimising manual handling risks.

For front-of-house, a Stannah A2C escalator and a 13-person passenger lift were selected to optimise visitor traffic flow, improve accessibility and enhance overall experience.

 

Challenges

 To optimise operations and resources, Stannah collaborated with teams across its divisions to ensure successful execution. Its Microlifts division installed the Goodsmaster lift, while the Passenger Lifts Division handled the passenger lift installation and the Major Projects Division oversaw the escalator.

 This coordinated effort and meticulous planning ensured a seamless and efficient installation process, enhancing overall project delivery. As one of the few lift companies offering a full range of lift products along with comprehensive servicing, Stannah stands out as an ideal multi-project lift solution, streamlining customer communication, project specification and overall project management.

Solution

Passenger lift

To improve accessibility for wheelchair users and those less mobile, Stannah installed a 13-person stainless steel MRL (Motor Room Less) traction passenger lift from the Maxilift range, with a 1,000kg weight capacity.

Operating at 1.0 metres per second across two floors, the lift features efficient VVVF drives for a smooth, quiet and energy-efficient ride. Integrated remote monitoring ensures reliable operation, while LED lighting and standby shutdown contribute to an A-rating in BREEAM.

The lift’s design includes adjacent-opening, two-panel entrances, stainless steel walls and premium vinyl stone black concrete floor, providing a sleek and spacious feel. Equipped with intelligent controls, GSM connectivity and compliant with EN81-73 safety standards, it offers both safety and ease of maintenance, providing a future-proofed and high-performance solution for the service station.

Escalator

With the end user in mind, Stannah proposed its A2C escalator solution featuring a 1000m wide step to ensure maximum pedestrian flow during peak hours. Operating at 0.5 metres per second, a 30-degree angle offers a gradual transition from flat to inclined, providing a smoother and more comfortable ride.

The A2C-30 escalator is equipped with a toughened glass balustrade for enhanced durability, a hot-dip galvanised truss for improved protection in damp environments and an auxiliary brake for an added layer of safety.

Designed with efficiency and sustainability in mind, the escalator features speed monitoring that slows down when not in use. This is ideal for locations with varying traffic flow, helping to reduce operating costs and extend the product’s lifespan.

It also delivers a quiet and efficient ride with high efficiency and low maintenance, thanks to its low-vibration, low-noise motor and VVVF drive.

Goods Lift

To facilitate safe goods transportation, Stannah installed the Goodsmaster CD goods-only lift. This heavy-duty goods lift, capable of carrying 1,000kg, features a robust steel cladding structure with protective epoxy finish, non-slip aluminium checker plate flooring and bump rails.

Operating at 0.15 metres per second, the lift has front-facing entrances for easy loading and unloading. The Goodsmaster is supplied with interlocking car and landing gates to prevent load movement during travel, car safety gear and a load weighing device to prevent overloading.

The goods lift also includes LED lighting with an automatic timer for energy efficiency, ensuring long-term reliability and performance.

 

Results

 The multi-lift solution provided by Stannah prioritises accessibility, safe operation and energy efficiency. Design was also an important consideration and Stannah collaborated closely with architects Whittam Cox to align with the original design scheme of this stylish new Welcome Break.

Lift Consultants, SVM associates commented “We were pleased to work with Welcome Break to provide the escalator, goods and passenger lifts in their new service station at Rotherham. Stannah were a natural fit as a delivery partner, being able to provide all products under one umbrella. The units have gone on to provide a reliable service for motorists and retailers alike.”

By offering both a passenger lift and an escalator solution, Stannah ensures full accessibility for wheelchair users and pushchairs, allowing easy movement between floors while maintaining smooth traffic flow, even during peak periods. A separate goods lift further enhances operational efficiency while ensuring customer safety.

Stannah successfully integrated three lift solutions into the building’s structure, completing the project ahead of schedule and within budget.

This cohesive and effective solution met the project’s diverse needs, ensuring seamless access throughout the building and efficient transportation of goods.

Continued product support

The Stannah East Midlands branch based in Mansfield, part of a nationwide network providing comprehensive lift servicing and support for all makes and models, is managing the lifts’ maintenance under the lift warranty, ensuring they stay in excellent condition with regular servicing. With the branch arranging on-site engineer attendance for the high-profile local opening day.

Archie Hungwe, Chief Operating Officer at Stannah Lifts, said:

“Working with Whittam and SVM Associates, we were thrilled to be involved in this exciting multi-million-pound motorway service area project on the M1 in Rotherham for Welcome Break. I would like to say a big thank you to all our teams for working so hard on this project. After lots of hard work, it’s great to see the site open and ready to welcome the public”.


CLICK HERE for more information

 

 


 

CBRE _ Property Management UK.JPG 

The Asticus London building, a striking ten-storey landmark, has undergone a remarkable transformation.

Originally constructed in 2006, the office building features a stunning new reception, business lounge, landscaped terrace, breathtaking 360-degree panoramic views, luxurious end-of-trip facilities in the basement, and the addition of four new Stannah passenger lifts, one of which can be used by emergency services in the event of a fire.

Architects, Aukett Swanke, envisioned a remarkable Cat A office refurbishment design, with a strong focus on sustainability, achieving BREEAM Very Good accreditations. The building prioritises inclusivity with the new lifts providing daily step-free access.

The Client

The re-imagined Asticus building was acquired in 2016 by AXA IM Alts, a global leader in alternative investments.

AXA IM Alts teamed up with primary contractors MND Construction Services, and architects Aukett Swanke, to undertake a comprehensive building refurbishment to all areas. This also included adding a new floor, all part of a broader lease opportunity.

Stannah worked with MND Construction Services and Aukett Swanke to create modern and compliant step-free access throughout.

 

Work

Stannah installed three passenger lifts, as a triplex, each accommodating 13 people, transporting visitors and staff from the ground floor all the way up to the new tenth floor, with one lift extending to the basement. Stannah installed the lifts using a scaffold-less method.

These passenger lifts were specified at 1000kg capacity and operated at a speed of 1.6m per second, providing a quick and efficient ride for passengers.

Stannah also installed a fourth lift which is for firefighting but can be used as a normal passenger lift. A firefighting lift is an essential safety asset in high-rise buildings and has dedicated control features to aid the fire and rescue service.

Some of the key features included in the firefighting lift design are trap doors, ladders, an emergency intercom system, and a separate power supply used by firefighters during rescue operations.

This ensures the lift can operate efficiently even if the main building electrics are compromised. All the lifts adhere to the relevant performance and safety standards.

Additional works included a new tenth floor, extensive refurbishments featuring new Cat A and optional Cat A+ finishes, the implementation of end-of-trip facilities such as bike storage racks, and a complete renewal of building services.

Challenges

CBRE _ Property Management UK

New modern lifts were required to accommodate the increased number of people working in the building due to the addition of a new storey. This resulted in the need for a fully compliant and modern firefighting lift to meet the associated fire and safety specifications.

There was an existing firefighting lift, although a survey by Stannah revealed concerns about compliance and operational issues.

Before the new lifts could be installed, the existing four lifts had to be removed whilst minimising disturbance to the building occupants, ensuring safety and retaining step-free access at all times.

This site was a live office environment, meaning it had existing tenants on some of the floors. As always for Stannah, safety was the first priority during the work as well as managing dust and noise levels.

The Stannah team took great care to understand the operational requirements and concerns of the building occupiers to ensure that disruption to their daily activities was kept to a minimum. This even involved site tours so that they were fully involved in all aspects of the programme.

 

Results

The lift solution provided by Stannah at Asticus centred around accessibility, design and, for the fourth lift. fire safety. Stannah provided a tailored lift solution that not only fulfilled the design requirements but also aligned perfectly with the logistical needs of the construction process.

To ensure precision in meeting the design requirements, Stannah delivered black-painted glass car finishes, with careful attention to the equal spacing of grey vertical stripes, even where the back and side panels met.

Given the lifts’ placement on an odd-floor triplex, Stannah incorporated priority buttons into the design of the lift which served all floors, enabling efficient group call planning.

Additionally, two lifts were installed with counterweight safety gears, emphasising Stannah’s commitment to delivering a functional, secure and aesthetically pleasing lift solution tailored to the specific needs of the project. The bespoke full-depth architraves, which were acid-etched with floor markings, added a decorative touch to the building’s design.

The passenger lifts resulted in a practical and elegant solution, transforming the building into a desirable office refurbishment with step-free access to all areas.

The 63,000sq of reimagined office space launched in February 2024.

 

Pete Canning, Passenger Lift Installations Manager at Stannah Lifts commented

“Communication was key during this project because we were working in a live office environment. This involved regular meetings with the client and project stakeholders on a daily and weekly basis to provide them with information about activities and address any of their concerns.”


CLICK HERE

To learn more about Stannah Lifts