Rinnai’s range of condensing hot water heater units using LPG are more economic to run than other sources such as oil or electric counterparts and they deliver lower carbon emission figures, greater energy efficiencies – this makes them the first choice for off-grid installations.

For installers, helping an off-grid user select an energy efficient water heater is critical — and a condensing continuous flow water heater using LPG is one of the most efficient and environmentally friendly options available. By choosing a continuous flow water heater, an end user can reduce energy costs by up to 50% and reduce greenhouse gas emissions by up to 61% (compared to electric equivalents). When compared with oil-fired systems this saving is even greater.

Tests show that a Rinnai Infinity condensing water heater has 107% efficiency and is low NOX compared with an oil boiler that emits approximately 364 mg/kwh NOX. That means a Rinnai condensing water heater emits approximately 10% of the NOX that an oil boiler emits, a 90% reduction. Therefore, combining a gas boiler and a Rinnai water heater will radically reduce NOX.

The EU is recommending that the maximum NOX level be reduced to just 56mg/kWh by 2018. Rinnai water heaters are already compliant with this proposed standard. This forms part of the new rules under the Eco-design of Energy-using Products Directive (ErP).

If we now compare the production of CO₂ between gas and electricity we find that for every GJ (277.78kW) of energy used gas will produce 44.44kg compared to 103kg with electric. We can see that for the same energy used electricity will produce twice the amount of one of the major greenhouse gases.

Then if we look at the emission per kW from thermal generation of electricity we find that electricity will produce 0.5kg of CO₂ compared to 0.16kg for the same kW generated with LPG, NOX production works out at 258kg per KW as compared to only 0.184kg.

The efficiency of this type of electrical generation is as low as 40%. So if we now compare the use of electricity to LPG to heat hot water we find that electricity is 40% efficient in comparison to a Rinnai water heater which returns 107% efficiency.

Electricity is not the ‘green’ fuel that its marketing portrays it to be. It has potential to produce more CO₂ and NOX and can be very costly.

A Rinnai LPG continuous flow water heater is an ‘on-demand’ system. When a hot-water tap is opened, the unit reads the demand and starts the heating process. The water flows through a heat exchanger, where it heats to the desired temperature using only as much gas as is needed. When the tap is turned off, the heater automatically shuts off.

For more details on RINNAI products visit www.rinnaiuk.com.

Evinox Energy recently worked with Higgins Construction & Circle Housing on a development in the creative heart of Walthamstow. Banbury Park is mixed-use scheme comprising of private and shared ownership homes, with landscaped community spaces, shops, offices, a community centre and public square that will help lead the regeneration of the area.

The site was a former warehouse, industrial works and electronics factory located in Waltham Forest. Evinox engineers completed a full design of the primary network for the district heating and hot water system for a complex of 6 different types of building.

The apartments are connected to the district heat network and each includes an Evinox ModuSat® FS storage HIU to provide heating and hot water. The integrated hot water storage within the ModuSat® enables the central plant to be reduced due to the increased thermal storage facility in each dwelling.

Residents at Banbury Park benefit from the Evinox PaySmart® pre-payment system, which is inbuilt in every ModuSat® Heat interface unit. The Evinox range of ModuSat® heat interface units, is the only solution available that features fully integrated pre-pay ready billing technology.

This system enables residents to be in control of their own energy bills by paying in advance and therefore removing any burden of building up unpaid bills or debt. Residents can purchase their energy online using our Residents Website 24hrs a day, at a local Payzone outlet, by monthly Direct Debit or Standing Order, using our Web App on a smart phone or tablet any time or over the telephone.

Energy Centre

Together with our CHP partners HELEC, a complete pre-fabricated skid plant room solution has been provided to supply the district heat network. This comprises of 1794kW ADI CD boilers, 109kWth CHP unit with 5000 L thermal storage and Matic-Pro combined pressurisation, expansion and deaeration unit.

Evinox Energy specialise in Communal and District heating solutions. Contact us today on 01372 722277 or visit www.evinoxenergy.co.uk for further information.

Leading British Manufacturer Keston Boilers has supplied three 55kW Heat Only twin flue boilers and a Frame and Header Kit to Lancing College in Lancing, West Sussex, which have been installed as part of a refurbishment project to improve the reliability of the heating system in one of the accommodation blocks and reduce overall running costs.

Lancing College is an independent boarding and day school, providing education for boys and girls aged 13-18 years. The boilers have been installed in Gibbs House, an accommodation block providing boarding facilities for 650 boys. Like all the buildings at Lancing College, Gibbs House is over 170 years old and the old heating system had previously been served by a central boiler room located in the main building over 50 metres away. The old boilers were not only unreliable and less energy efficient, but the long external pipe run resulted in excessive heat loss, as did the five inch cast iron pipework delivering the hot water to the radiators in the building, all of which contributed to high fuel bills.

The new Heat Only Boilers were installed on Keston’s Frame and Header Kit, which was delivered in prefabricated modules that were then quickly and easily assembled on site by Chris Smith, Heating Engineer. The system was installed in a new plant room within the building, eradicating the need for a long pipe run, and serves 60 radiators. Around 200 yards of new 67mm copper piping runs along four foot high tunnels located throughout the building, ensuring they are out of sight and retain the character of the school.

There are around 30 Keston boilers installed throughout Lancing College and this installation was the first that utilised the new range of Keston boilers, which were launched in 2013. Chris Smith commented, “The Keston Heat Only boilers were very straightforward to install, especially with the Frame and Header kit as supplied by Keston. They have been running perfectly since their installation and the increased energy efficiency has meant a large reduction in running costs for the school.” He added, “The flexible flueing options offered by Keston twin flue boilers were perfect for our needs, as they allow us to hide the flues so they do not affect the character of the buildings by emerging from the original flintwork.”

The Keston Heat Only condensing boiler range includes 45kW and 55kW outputs and it is the only dedicated boiler on the market for domestic or light commercial applications that combines twin flue capabilities with a fully modulating Energy related Products (ErP) approved pump built into the framework of the appliance. Continuing to make boiler efficiency easy for customer and installer alike, the Keston Heat-Only range is also supplied with integrated weather compensation and an outside sensor as standard. Weather compensation is instantly activated when the outside sensor is installed, creating a simple ‘plug and play’ solution with no intricate programming required.

Keston’s boiler range for both domestic and light commercial applications, manufactured in Britain and launched in 2013, includes system, combi and heat-only boilers, all of which incorporate market-leading twin flue capabilities that are highly adaptable, offering the perfect solution for awkward installations. All boilers in the range offer a high SEDBUK efficiency rating, are Energy Saving Trust endorsed and also feature on the Energy Technology List (ETL), qualifying them for inclusion in the Government’s Enhanced Capital Allowance (ECA) scheme.

For more information on Keston’s condensing boiler ranges, visit www.keston.co.uk, email info@keston.co.uk or call 01482 443005.

District heating specialist to meter and monitor heat network performance at the Chobham Farm development of registered housing provider East Thames.

Insite Energy, the district heating specialist, has been appointed to provide full metering, billing, payment and monitoring services to one of the UK’s largest energy centre schemes. The community energy network which previously supplied the Olympic Village in Stratford, London, will now distribute heating and hot water to the 176 flats and houses of Chobham Farm, a new development by registered housing provider and social regeneration charity East Thames.

East Thames Group says monitoring the network will ensure residents pay the appropriate amount over the long-term, promptly identify if any faults occur in the system. Data gathered from this scheme will help East Thames Group develop the most efficient energy systems for housing schemes in future.

Simon Page, project manager at East Thames Group, commented: “In a competitive tender process, Insite Energy impressed us with its ability to provide a comprehensive service, which crucially will include monitoring overall heat network performance on site. Insite also demonstrated an excellent approach when working with the construction contractors to ensure successful metering system deployment.”

Anthony Coates-Smith, Insite Energy’s Business Development Director, said: “The planning consent for this site requires East Thames to connect to the district heating scheme operated by Cofely, taking away some control over the cost of heat supplied to their residents. Through Insite Energy, East Thames receives detailed information on heat network performance within their buildings, safeguarding the element of heat costs they can influence and reducing the risk of costly penalties included in the supply agreement with Cofely.

“With the provision of Insite’s flexible pre-payment and billing system, East Thames is also able to keep in touch with residents’ needs and protect itself from the risks associated with operating a heat network.”

The Stratford site’s energy centre scheme – which includes combined heat and power (CHP) units and biomass boilers, creating 20% fewer CO₂ emissions than a conventional system – was the largest in the country, with approximately 10 miles of energy distribution networks, when officially opened by Mayor of London Boris Johnson in 2011. It was designed at the outset to be adopted after the 2012 Olympics by new buildings and communities and the London Legacy Development Corporation (LLDC) has granted planning consent to ultimately build a family neighbourhood of more than 1,000 new homes on the six hectare (14.8 acre) Chobham Farm site.

Insite Energy is the provider of metering, billing and payment services to more than 120 communal and district heat networks and 15,000 end-customers across the UK.

For more information please visit www.insite-energy.co.uk.

Between August 1998 and February 1999 three Scalebuster® units were installed at the James Hornby School in Basildon, Essex. The Scalebusters® were specified to protect the calorifiers in the school heating system by inhibiting the build-up of harmful limescale and so preventing the need for costly repairs or premature replacement.

In 2014 a refurbishment programme was undertaken at the school that included changes to the heating system, but the question was, had the Scalebusters® actually done their job? The ideal chance came when the three original units were removed 16 years after their installation. Between December 2014 and February 2015 new boilers were installed for the upper and lower schools as well as the sports hall. At the same time five new Scalebusters® were installed to protect the new system and the old units were returned for a detailed examination.

Their effectiveness was immediately evident from the condition of the calorifiers. The contractor involved in their replacement took internal photographs of the original, 16 years old calorifiers, shown here, before they were removed. The images show no build-up of scale on either the cylinder walls or the heat exchange walls demonstrating conclusively that the ScaleBusters® had performed their function of inhibiting the build-up of hard scale throughout their operational life.

But what of the Scalebusters® themselves? If the old boilers hadn’t been replaced would they have carried on working even longer? External inspection showed the body of the units to be in good order. The nickel plating was in good condition and there was no corrosion or pitting of the brass. The central spindle and all PTFE fins were in good order on the flanged units. All the fins were present and were tight within their housing indicating that minimal reduction in the anode had taken place.

The PTFE sections within the ISB C50 threaded unit were clean and showed no sign of wear or fouling. All the zinc anodes were in place and although some signs of depletion were evident, this was to be expected after having been in use since 1999. A detailed internal and external examination of the units confirmed that despite the use of a zinc anode as a sacrificial element, minimal depletion of the anode had actually taken place.

During a service life in excess of 15 years, thousands of cubic metres of water would have been treated as they passed through the three units. The service life in the case of the removed ScaleBuster® units within the system and water type at the James Hornby School was found to be well in excess of 15 years.

How do Scalebusters® work?

The Scale-Buster® unit conditions hard water (preventing lime-scale build up) by combining a number of actions that release zinc ions into the water as it passes through the unit. It does not contain magnets or involve any sort of magnetic process. It needs no power supply and works completely automatically with no control panel to maintain. They are WRAS approved and can be installed with new systems or retro-fitted to existing installations.

Scale-Buster® is designed to cause precipitation of calcium carbonate into the water stream. This is as a result of the breakdown of the bicarbonate into carbon dioxide, water and carbonate due to the effects created within the Scale-Buster® itself. The particles which are formed in the water stream act as nuclei for the formation of further scale when the water is heated. In this way, scale deposition upon heating surfaces is minimised.

When a salt is precipitated from solution it results in a relatively less saturated solution remaining. The less saturated water is then able to dissolve and breakdown existing scale from pipe surfaces which form bigger particles that can then be removed from the system with a filter.

For further information, call The Rodin Group on 01795 423400, Email info@therodingroup.co.uk or visit www.therodingroup.co.uk

Rinnai, leading manufacturer of a complete range of A-rated continuous flow gas fired water heaters, is supplying the UK with what is thought to be the most reliable individual units* on the market.

The ErP A-rating** applies over the complete Infinity range – from small domestic models to XXL sized industrial units. Rinnai is the only manufacturer that can field a complete range of gas fired water heaters that more than achieve to coveted A-rating.

Rinnai can combine high efficiencies with high levels of reliability. During 2015 warranty claims against Rinnai stood at 0.05% demonstrating unparalleled reliability.

The next issue is servicing – the Rinnai system is simple and straightforward to service as all components are easily accessible and parts readily available.  Compare this to a business, for example a fast food restaurant or a hotel, running on just one cylinder, they would have to shut down the hot water system to allow it to be drained and inspected as part of the service. This would mean that during this down time the business may have to cease operating for a few hours while the work is carried out.

Another problem is a breakdown: if your only source of hot water fails then you have no means to provide hot water until the fault is rectified. If we take the worst-case scenario of a cylinder failure the whole thing needs to be replaced and this is no easy task especially when you consider the weight. You are now looking at multiple problems:

  1. a) You have lost all hot water capability.
  2. b) You need to pay for a replacement (if it isn’t covered by warranty).
  3. c) You have to pay for engineers to remove the faulty one and replace it, which can take days to change.

If we then look at a Rinnai Infinity water heater or multiples thereof, the down time would be reduced significantly, in the case of multiple units, putting up with reduced capacity for a very short period of time.

Servicing not only reduces the down cost of the business but can also reduce the servicing cost as a Rinnai water heater can be fully serviced and back operating within one hour. If a unit fails whereby it needs replacing, this replacement can be done in a couple of hours and if you have a bank of heaters you will still have the facility to provide hot water, albeit at a slightly reduced capacity, while one of the heaters is down. This is nowhere near as disruptive as having no hot water at all, and perhaps having to close the business while servicing or replacement takes place.

According to Rinnai UK Associate Director Chris Goggin: “The configuration of the Rinnai system is supportive of operational reliability. In effect, if you have a cylinder and you need to service it, or it breaks down, you are left with nothing but a standing body of water.

“Many Rinnai systems supply additional benefits to storage by using multiple heaters, let’s say three so the total system is made up of 33.3% by each heater. If one needs servicing there is still 66.66% still operational so there is no downtime for the hotel, restaurant or any other facility that uses hot water as a criteria feature.

“Some facilities incorporate additional heat engines as a means of built-in redundancy so that the system will always operate at full capacity even during servicing.”

Goggin concludes: “The Rinnai continuous flow system has significant USPs over any stored hot water system while at the same time offering built-in reliability and peace of mind to both installers and their customers.”

* With regards to the reliability of the units themselves a comparison of unit sales from 2013 until April 2016 against Rinnai UK’s warranty database shows 0.003% first year failure rate. (2013 is when the new database was set up.)

** All water-heating products sold in the UK need to meet minimum energy performance criteria in order to be legally placed on the market, and require an energy label.

For more information on the RINNAI product range visit www.rinnaiuk.com

The Posi-Joist floor system was recently used on high quality homes for Severnside Housing, incorporating the latest in Mechanical Ventilation and Heat Recovery systems.

Severnside Housing is one of Shropshire’s largest social landlords owning more than 5,400 properties in Shrewsbury and the surrounding areas. A not-for-profit company they invest in their neighbourhoods and work closely with residents, partners and the wider-community to deliver their vision of ‘Excellent Homes in thriving communities’. Morris Property Ltd were chosen by Severnside due to their reputation for building high quality homes and the long standing relationship between the companies. Morris Property are keen to partner on future development projects in Shropshire. The contract commenced on the 23rd March and is scheduled for completion in June 2016.

MITEK-INSET-1

AC Roof Trusses were chosen by Morris Property to supply and install the timber frame walls, roof trusses and Posi floor joists for the 28 room, 3 floor apartment block. The apartments are to have a robust detail sound floor along with a MVHR system in each of the apartments.

The two bedroom apartments all have ‘state of the art’ Mechanical Ventilation Heat Recovery systems supplied and installed by SCS Group (Shropshire Cooling Services) who although local to the site also operate nationwide.

MITEK-INSERT-2SCS commented on the Abbey Foregate job “We recently used Posi joists supplied by AC Roof Trusses and found that because of this, we were able to provide a more competitive installation price due to the reduced labour costs. Because they were metal web Posi joists we did not have to cut any holes for the ducting to pass through. It also enabled our electricians and plumbers to save time on installation and on materials costs. Having to use a core drill every time our ducting passed through a joist would have taken a lot of time and effort, but we didn’t because they were Posi-joists.”

 

“As a company we design and install whole systems and with the Posi joists we were able to bring it all together much quicker and more efficiently.”

For more information please visit www.mitek.co.uk.

Encasement is the UK’s only FSC® certified manufacturer of pre-formed plywood pipe boxing and boiler casings, so you can box in boiler pipe work quickly and easily while also ensuring compliance with your company’s sustainable procurement policy.

Every Encasement boiler casing carries a full FSC® ‘Chain of Custody’ certification from the Forest Stewardship Council to verify that the timber used is from sustainable and managed sources, so you don’t have to worry about compliance.

They’re quick and easy to fit on-site too. As our pipe boxing an boiler casings are pre-formed and pre-finished in durable melamine, they can be fitted in less than half the time of site made alternatives and are easily removed for boiler servicing and maintenance, which saves time and money on every service visit.

Further savings can be made as our casings can be easily fitted by heating engineers or plumbers at the same time the boiler is installed, rather than having to arrange a separate visit for a joiner to box in the unsightly pipework. ‘One visit – one fit’. It really is that simple.

With Encasement boiler pipe casings, less is definitely, more:

  • Less time
  • Less cost
  • Less travel
  • Less disruption
  • Less hassle

Encasement FSC® compliant boiler casing. Simple, quick and cost effective – Job Done!

For more information on our boiler pipe casings, please visit:
www.encasement.co.uk/boiler-pipe-work-casing.html
www.encasement.co.uk/gallery_boiler-pipe-casing.aspx
View our FSC® certificate here
www.encasement.co.uk/Encasement-Ltd-FSC_Certificate.pdf
Learn more about our sustainable products here.

Rinnai Energysaver fanned convection powered flue gas fired space heaters are designed specifically for use in schools, community centres, libraries, conservatories and churches and other large spaces where they offer fastest heat up at lowest running cost.

The Rinnai Energysaver 309FT has had a stylish makeover to offer contemporary cabinet styling that matches its superior energy saving performance. The new, sleek good looks of this popular model bring it in line with modern minimalist tastes in interior aesthetics. It is eminently suited for architects, specifiers and installers tasked with projects demanding both top end styling and performance.

Sporting a modern, sleek casing, the heater simply blends into the background while still offering exceptionally high efficiencies in operation and subsequently reduced running costs.
Rinnai has also provided the appliance with a no-quibble 15-year guarantee on the heat exchanger, positive proof of its confidence in the periority of its quality Japanese engineering.

Rinnai Energysaver 309FT, with its low surface temperature (LST) casing to avoid any risk of burns, offers easy on/off operation and intelligent features such as self-diagnostics and a self-learning pre-heat time to maximise heat up time and energy consumption.

The Rinnai Energysaver 309FT delivers warm air at floor level for greater comfort and coverage of even greater spaces and turns in efficiencies of 85.9%. Because the heater heats from the floor up and modulates gas usage in relation to room temperature, the unit provides unparalleled levels of comfort combined with efficiency for large spaces, such as churches with vaulted ceilings.

It has an input of 3.4kW and output of 2.92kW. The streamlined unit measures 695mm x 465mm x 257mm. Natural Gas usage has been pegged at 0.31m3 while LPG consumption is 0.26kg/hr.

Rinnai Energysaver units are very easy to install as they do not need expensive (and extensive) ductwork, nor do they involve the necessity to run domestic heating circuits for radiators or pipework to boilers. This cuts down dramatically on cost and time at the point of installation.

Standard flue is 240mm-400mm with alternative flues to fit walls ranging from 5mm-1000mm. Flue hole diameter is 80mm and maximum flue length is 7 metres.

Rinnai Energysaver 309FT delivers energy-efficient and consistent warm air powered by Natural Gas and LPG options and is built with fully modulating burners so heat output and energy input is reduced as the space warms up – a valuable cost saving benefit.

The heaters are also suitable for central BMS control. This feature allows the building manager to run any number of Rinnai space heaters off a central time clock providing heat to the large of spaces. The Energysaver Multicontroller is not limited to single Energysavers as the flexibility of the system guarantees units can be mixed and matched to satisfy even the most unique of buildings.

The Rinnai Energysaver range more than exceed seasonal thermal heating guidance under Building Regs Part L.

“Rinnai Energysaver 309FT space heater really does deliver a cost saving on installation, low operational costs and maintenance, lower life cycle costs, lower replacement costs, high energy efficiencies. It is infinitely suitable for refurbishment projects and comes with a 15-year warranty on the heat exchanger, which is testament to the superior engineering quality of the appliance,” explains Chris Goggin, Associate Director of Rinnai UK.
For more information on the RINNAI product range visit www.rinnaiuk.com.

Rinnai’s Chris Goggin explains why hybrid technology is an attractive option for reliable and cost effective hot water provision as it becomes abundantly clear that renewables, on their own, just aren’t delivering.

Energy efficient continuous flow condensing gas fired water heaters clearly have their part to play as we head into ‘greener’ country. This ‘tankless’ form of hot water delivery is growing in popularity and offers huge ongoing financial benefits to building owners and tenants even before the advanced energy saving technologies of the units themselves are taken into account.

This makes the argument for their inclusion as a component in a hybrid renewables/gas boosted hot water system even more compelling. It is becoming abundantly clear that there is not one single method to achieve energy efficiencies as renewables on their own just aren’t delivering. There is no point in waiting for the perfect renewable solution to come along we can utilise a very effective mix of existing renewables and traditional technologies.

In effect we need to find ways of using current renewables technology, be it solar thermal, solar PV or heat pump technology, in a practical manner maximised by traditional fuel sources – in this instance, gas, whether Natural or LPG.

Modern renewables-ready heavy-duty condensing water heater units guarantee the highest efficiencies and therefore the lowest running costs of any commercial water heater. In short, a HE unit used as a gas booster for solar or ASHP systems maximises solar gain, as it only consumes energy when more hot water than the panels can cope with is needed. The rest of the time the unit is inactive.

The use of evacuated tube or flat plate solar collectors can make a big difference when paired with condensing continuous flow water heaters as a boost. Doesn’t it make sense to store the free energy collected by an array of solar panels within in a solar thermal store which can be heated to the required temperature on demand by a gas fired water heater or the water to the outlet can be easily boosted, taking advantage of the expansive range of modulation associated with Rinnai technology.

A gas fired continuous flow water heater is also the only booster that ensures never-ending hot water – no matter how fierce the demand. Fossil fuel is only used when the renewable store is below its set-point, thus reducing the dependency on fossil fuel and reducing CO2 emissions.

Easily ‘retro-fitable’ with current renewable technology, these units are a better environmental option than an electric booster. By using gas, a direct energy source, you can significantly reduce greenhouse gases.

Renewables ready Rinnai Infinity condensing HDC1200 internal and external models show an impressive energy performance of 107 per cent net efficiency while the larger Rinnai HDC1500 models turn in 105 per cent net efficiency*.

For large commercial, operations Rinnai has just launched the Infinity HDC1600i, its premium condensing water heater which has been tested to below 20 ppm NOx, producing the lowest emissions on the market, with 107 per cent gross efficiencies*.

Infinity HDC 1600 renewables-ready, retro-fitable low NOx series is the first heater of its kind to utilise pre-mix burner technology. The newly developed down-firing burner allows increased efficiency and reduces NOx gases. The patented burner also reduces the possibility of flame lift, which has previously been a problem with premix down firing burners. It has a 13-1 turn down ratio – the largest on the market – of 58.4kw-4.5kw and is ultra quiet in operation – so quiet that you wouldn’t know it was on unless you glance at the number on the display.

The Infinity 1600i low NOx series is available with an output of 58.4 kW producing 16.2 litres of temperature controlled hot water per minute (or 9.73 per hour) raised at 50°C. That is .2 litres a minute more than the existing Rinnai Infinity 1500 HDC.

*Tested and certificated by Technigas to EN 26.

For more details on RINNAI products visit www.rinnaiuk.com.