Posts

For any residential building project, it would be fair to say that time saved on site is hugely beneficial for developers, contractors and housing associations alike, helping to reduce project costs and enabling residents to occupy properties as quickly as possible. With this in mind, Evinox Energy has introduced remote commissioning and warranty validation for their ModuSat heat interface units (HIUs), which can significantly reduce the cost of commissioning and time spent on site by engineers manually checking and adjusting settings.

Many other heat interface units for communal and district heating developments require an engineer to physically attend site to set-up every individual unit manually, adding time and cost to the project. Evinox’s electronically controlled ModuSat HIU’s feature SmartTalk communication technology and can be connected over the internet to remote servers, enabling Evinox to check the operation of each unit remotely and adjust settings where required.

Once ModuSat units are installed and ready to be commissioned the following quick and simple process takes place –

  • Installer Registers ModuSat Units Using Evinox’s Online Registration Portal
  • Evinox Check the Operation of Each ModuSat Unit remotely
  • Evinox Visit site to inspect a sample of units (Around 10% of the total units)
  • Evinox will then certify the units and issue certificates
  • The Warranty period begins

The benefits don’t just end there! During the aftercare period, following practical completion, Evinox’s SmartTalk remote communication system enables checks to be made and faults to be diagnosed away from site. Just think about the costs incurred every time an engineer is called to site, well these costs can be avoided using Evinox’s communication system to adjust settings remotely.

It is also important to factor in on-going servicing, which maximises the life of the Heat Interface Unit and ensures optimum performance of both the HIU’s and also the wider heat network. Evinox’s SmartTalk® communication system enables them to carry out scheduled maintenance checks remotely over the internet. The system in each apartment can be fully controlled remotely, including timings and settings, with remote diagnostic capability and client support. This can avoid unnecessary call-outs as a result of user error. Fault alarms can also be checked by testing the operation of components.

Evinox offer after-care service and maintenance plans that are available with one or two-year contracts providing flexibility, and additionally, combined packages for energy billing and maintenance, all under one roof and with discounts available.

Find out more about Evinox’s Heat Interface Unit Remote Warranty Validation and Service and Maintenance Plans by visiting www.evinoxenergy.co.uk or contact Evinox at info@evinox.co.uk for further information.

Giacomini UK is on a mission to create homes out of underused office spaces around the country!

In recent months Giacomini has been involved in many projects that transform commercial office units into residential areas. The latest project is on a site in Crawley, called Babcock House, where 185 apartments are being created in a disused eight storey office block.

The Babcock House site will create 185 units comprising of studio accommodation as well as one and two bedroom flats – all designed to a very high specification, along with having excellent communal facilities.

The work will involve re-roofing the building, renovating the external façade and installing 185 of Giacomini’s twin plated heat interface units to allow each apartment independently controlled, efficient heating and hot water in the multi-dwelling building.

Since regulations surrounding planning permission were altered, meaning that Class B1 offices could be converted to Class C3 residential dwellings without the need for specific planning and development permission, there has been a noticeable growth in projects of this nature.

Matt Lowe, Giacomini UK’s managing director, commented “The planning permission policy change for projects like this aims to support an increase in housing supply, bring empty properties into productive use and encourage regeneration of office space. The Crawley development is the latest project we have been involved in where we are utilising disused space to bring revenue and housing to the local economy whilst complementing the buildings’ existing features.”

The project, estimated to cost £16.5 million, is due to be completed by September 2016.

For more information on Giacomini, and its heat interface units, please visit www.giacomini.co.uk.