Kemmlit lockers specified for Brighton’s £3.5 million premier office refurbishment project
Mocatta House is part of the Trafalgar Place flagship development in Brighton.
Named after David Mocatta the architect who designed the original building in the 1890’s and also Brighton’s Railway Station, Mocatta House has recently been refurbished at a cost of £3.7 million.
The building has been extended vertically by developers Faithdean to provide high end office accommodation including a new sixth floor and roof terrace.
Kemmlit R2Z lockers with electronic locks were specified by architects Morrow & Lorrainne for one of the main office suites.
The Type R2Z Locker System, which has a 20-year guarantee, utilises high quality 100% corrosion resistant aluminium for the locker carcass with a choice of two high quality door options – solid grade laminate finished in a special overlay to protect against scratching or a double shelled aluminium door with a ‘Crystal Coat’ stove enamelled finish.
For this project, 13mm solid grade laminate (HPL) doors with rounded edges were specified.
The Type R2Z locker from Kemmlit UK is part of a comprehensive range of high performance cubicle and locker systems offered by the company, designed and engineered for a wide range of applications and environments.
Kemmlit also provide a design and installation service.
Leave a Reply
Want to join the discussion?Feel free to contribute!